What is the maximum points that a data center project can earn using cooling tower water use credit?

  1. 2 points

  2. 3 points

  3. 4 points

  4. 5 points

The correct answer is: 4 points

A data center project can earn a maximum of 4 points for the cooling tower water use credit under the LEED O+M rating system. This credit encourages projects to utilize water efficiently in cooling tower systems, which is particularly relevant in data centers where significant cooling requirements exist. The 4 points available are typically structured around the percentage of cooling tower water use that is reduced compared to a baseline. Points are awarded based on successful reduction strategies and demonstrating improved performance over the baseline. Collectively, these strategies help promote sustainable water use and energy efficiency in building operations, aligning with LEED's overall mission to encourage environmentally responsible practices. While options suggesting 2, 3, or 5 points indicate varying possibilities, they do not reflect the standardized maximum allowed for this specific credit within the framework established by LEED for existing buildings. Understanding the structure of the points available for specific credits is crucial for effective LEED project planning and implementation.